Technical expertise and reconstruction sketch for
replanning and roof reconstruction of the Republican
Stomatology Clinic Building (Architectural heritage)
located on Vlaicu Parcalab street, Chisinau
Review the available archive documents and detailed design
Perform building survey and technical assessment
Perform calculations considering actual seismic requirements, changes of roomsdestination and loads
Elaboration of the technical expertise report with findings, solutions and conclusion
Elaborate the general and situation layouts
Elaboration of the existing and proposed architectural plans, cross sections andfacades
Elaboration of the 3D model of the rehabilitated architectural heritage building
Develop the street development layout considering heritage building rehabilitation inthe historic heritage area of Chisinau
Rehabilitation of the centralized irrigation system Caplani
(cca. 2500 ha)
Topographical and geotechnical surveys
Feasibility study and selection of pipe material analysis
Technical assessment of the existing pumping station structure
Pedological assessment
Water hammer analysis
Detailed Design of the pumping station with 4 irrigation pumps (Q=900 m3/h, H=90),vacuum, drainage and ventilation systems
Detailed Design of approx. 42km of water supply networks for irrigation with hydrants
Consulting services for design coordination with local authorities
Author supervision of the construction works
Construction of public sewer system in Puhoi street
neighborhood
Technical assessment of the existing pumping station structure
Detailed design for demolition of existing pumping station structure
Detailed design of 3 sewerage pumping stations (Qtot=567 m3/d)
Detailed Design of approx. 11 km of sewer gravity and pressure networks
Detailed Design of power supply and electrical networks
Consulting services for design coordination with local authorities
Author supervision of the construction works
Supervision of construction works for improvement of
energy efficiency of Holercani Lyceum (Holrecani village),
Mihai Eminescu Lyceum (Ungheni town) and Ion Vatamanu
Lyceum (Straseni town) buildings
Review the detailed design and compare with actual building’s state and condition
Review Contractor’s quality assurance plan and establish phases when mandatoryinspection is required
Materials quality check, review quality documents and laboratory results
Supervision of construction works
Organize works taking over of works and final taking
Supervision of remedy works in Defect Notification Period
Architectural/Engineering services for USAID financed
projects
Review the detailed design drawings Conduct site visits for supervision of constructionworks (Mediacor building)
Review of change order documents, testing plans and taking over of works documents(Mediacor building)
Develop presentations and organize training sessions related to Moldovan buildingregulations and industry practice, best practices in health and safety & on-siteenvironmental compliance, cross-cutting issues in design and construction
Develop Feasibility study for improvement of educational facilities in Republic ofMoldova (14 educational institutions)
Reconstruction of the pumping station, construction of
water supply pipelines and retention basin for irrigation of
agricultural lands in Ustia Village (cca. 90 ha)
Hydrological study (Nistru river)
Topographical and geotechnical surveys
Pedological assessment
Water hammer analysis
Detailed Design of 2 pumping stations (main and secondary)
Detailed Design of approx. 4 km of water supply networks for irrigation
Consulting services for design coordination with local authorities
Author supervision of the construction works
Supervision of construction works for rehabilitation and
extension of water supply and sewerage systems in
Calarasi and Ungheni towns
Review the detailed design drawings
Review Contractor’s quality assurance plan and establish phases when mandatoryinspection is required
Materials quality check, review quality documents and laboratory results
Supervision of construction works
Organize works taking over of works and final taking
Supervision of remedy works in Defect Notification Period
Technical expertise and reconstruction sketch of the
Mayoralty building in Stauceni Commune, Chisinau
Review the available archive documents and detailed design
Perform building survey and technical assessment
Perform calculations considering actual seismic requirements, changes of roomsdestination and loads
Elaboration of the technical expertise report with findings, solutions and conclusion
Elaborate the general and situation layouts
Elaboration of the existing and proposed architectural plans, cross sections andfacades
Elaboration of the 3D model of the rehabilitated building
Water supply and sanitation in Moldova center. Detailed
Design of the Main transmission pipe (50 km) from
Chisinau to Straseni and Calarasi rayons and of 2 villages
(158k inhabitants).
Partial Topographical and geotechnical surveys
Detailed Design of approx. 50km of water supply main
Detailed Design of one new booster pumping station in Calarasi rayon
Detailed Design for replacement of pumping equipment in 2 existing pumping stations
Detailed Design of chlorination plants in Straseni (main reservoirs) and Calarasi (mainPS) towns
Preliminary designs of water supply systems of 4 villages and Detailed design of 2villages
Consulting services for design coordination with local authorities
Adaptation of detailed design for sludge treatment facility
by the pyrolysis method at Chisinau Waste Water
Treatment Plant (806k PE)
Topographical and geotechnical surveys
Technical assessment of the existing structure and development of the design forstructure demolition
Review and adaptation of the Detailed Design Drawings to local regulations andnorms.
Review and adaptation of Hydraulic Calculations
Elaborate design explanatory notes
Elaborate construction organization plan and work program
Provide support in obtaining approval and verification of the design drawings
Author supervision of the construction works
Feasibility study for protection against field collapse in the
perimeter of underground mine of J.S. "Mina din Chisinau"
with the development of the alternative source of drinking
water supply for the inhabitants of Chisinau city
Survey of Current Situation and Justification of Investment
Analysis of scenarios and determination of optimum
Elaboration of investment description
Cost benefit analysis and Risk evaluation
Environmental Impact Assessment for the Chisinau Waste
Water Treatment Plant Rehabilitation
Elaborate Environmental Protection Chapter
Elaborate the Detailed Design Explanatory Note
Consultancy services during environmental expertise of the DD drawings
Adaptation of the Detailed Design for rehabilitation of the
Chisinau Waste Water Treatment Plant (water supply,
sewer, heating and gas installations and networks)
Review and adaptation of the Detailed Design Drawings to local regulations andnorms.
Review and adaptation of Hydraulic Calculation
Elaborate design explanatory notes
Elaborate construction organization plan and work program
Provide support in obtaining approval and verification of the design drawings
Author supervision of the construction works
Feasibility Study for renovation of the building for
premature babies, part of the Mother and Child Institute, as
well as the provision of medical equipment
Survey of Current Situation and Justification of Investment
Preliminary technical assessment of the existing building
Analysis of scenarios and determination of optimum
Elaboration of investment description
Cost benefit analysis and Risk evaluation
Technical Expertise of the Main Waste Water Pumping
Station building in Hancesti town
Review the available archive documents and detailed design
Perform building survey and nondestructive tests
Perform calculations considering additional load from new mechanical equipmentproposed to be installed (overhead hoist, automatic screens for primary treatment,water gates on admission channels, gate valves and piping)
Elaboration of the technical expertise report with findings, solutions and conclusion
Adaptation of the Detailed Design of Chisinau Waste Water
Treatment Plant (Process compartment) – I and II Phase
(806k PE)
Review and adaptation of the Detailed Design Drawings to local regulations andnorms.
Review and adaptation of Process Calculation
Review and adaptation of the Process Description Report
Author supervision of the construction works
Total number of designed new and rehabilitated structures I phase – 38 pcs.
Total number of designed new and rehabilitated structures II phase – 10 pcs.
Detailed Design of Chisinau Water Supply Networks
Topographic survey
Geological study
Detailed Design of 64km of water supply networks.
Consulting services for design coordination with local authorities
Author supervision of the construction works
Total pipelines to be designed and reconstructed: 64 Km. Manholes – 700pcs.
Detailed Design of 2 Sludge Centrifugal Decanters and 2
Sludge Reservoirs for Chisinau Waste Water Treatment
Plant (806k PE)
Geological study
Detailed Design of 2 sludge centrifugal decanters and 2 sludge reservoirs for waste water including General layout, Architectural, Structural, Process, Water andWastewater networks compartments
Author supervision of the construction worksSupervision of Reconstruction of Existing Production Hallinto a Warehouse for Food Products
Detailed Design, Works Supervision and Contract Management for reconstruction ofthe existing building with 2 and 3 floors changing its destination and erecting anadditional floor for offices