OUR RECENT PROJECTS

Technical Expertise of the Main Waste Water Pumping Station building in Hancesti town
Review the available archive documents and detailed design.
Perform building survey and nondestructive tests.
Perform calculations considering additional load from new mechanical equipment proposed to be installed (overhead hoist, automatic screens for primary treatment, water gates on admission channels, gate valves and piping).
Elaboration of the technical expertise report with findings, solutions and conclusion.

Adaptation of the Detailed Design of Chisinau Waste Water Treatment Plant (Process compartment) – I and II Phase
Review and adaptation of the Detailed Design Drawings to local regulations and norms.
Review and adaptation of Process Calculation.
Review and adaptation of the Process Description Report.
Author supervision of the construction works.
Total number of designed new and rehabilitated structures I phase – 38pcs.
Total number of designed new and rehabilitated structures II phase – 10pcs.

Detailed Design of Chisinau Water Supply Networks
Topographic survey.
Geological study.
Detailed Design of 64km of water supply networks.
Consulting services for design coordination with local authorities.
Author supervision of the construction works.
Design coordination will local authorities and utilities agencies.
Total pipelines to be designed and reconstructed: 64km; manholes – 700pcs.

Detailed Design of 2 Sludge Centrifugal Decanters and 2 Sludge Reservoirs for Chisinau Waste Water Treatment Plant
Geological study.
Detailed Design of 2 sludge centrifugal decanters and 2 sludge reservoirs for waste water including General layout, Architectural, Structural, Process, Water and Wastewater networks compartments.
Author supervision of the construction works.

Reconstruction of Existing Production Hall into a Warehouse for Food Products
Detailed Design, Works Supervision and Contract Management for reconstruction of the existing building with 2 and 3 floors changing its destination and erecting an additional floor for offices.
Author supervision of the construction works.

OUR CORE TEAM PROJECTS

(Several Projects from our Key Personnel Portfolio)

Rehabilitation of Centralized Irrigation Systems in Moldova
Detailed Design, Work Supervision and Contract Management for 9 Centralized Irrigation Systems, serving more than 12 villages along Nistru and Prut Rivers.
Works Contracts based on FIDIC – Red Book Contract Conditions.
Total pipelines reconstructed: 530 Km.
Total pumping stations rehabilitated: 33 pumping stations with 104 pumps.

National Water Supply and Sanitation Project in Moldova
Supervision of construction works in 23 rural localities and in 3 towns.
Works Contracts based on World Bank Contract Conditions.
Total water supply and sewerage pipelines reconstructed: 200 Km.
Water treatment plants: rehabilitated – 2; built – 2.
Water pumping stations build and rehabilitated – 11.
Waste water pumping stations – 1.

Balchik Water Supply and Sewerage and Sewerage Network Extension and Rehabilitation in Bulgaria
Works Contracts based on FIDIC – Red Book Contract Conditions.
Rehabilitation of existing Reservoir, Construction of Chlorination Station, Construction of Booster Station.
Construction of approx. 38 km of water supply network.
Construction of approx. 4.5 km of main gravity sewage collectors, 21 km. of secondary gravity sewage system plus branches for house connections.
Rehabilitation of the existing Sewerage Pumping Station.

Sewerage Project in the City of Korça, in Albania
Sewage Construction, Construction of Storm-Water Tanks.
Construction of: 90 concrete shafts; 2 storm water tanks; 1 syphon; 1 culvert (tot. 2.400 c.m. of concrete).
Total of gravity sewage pipeline (concrete and HD polyethylene): 5.7 km.
Mechanical installations.
Financed by KfW - value 3,2 million euro.

Design of 1 store and 2 warehouses for storing phytosani-tary products and fertilizers, Moldova
Developed general layout of the industrial area with details for access roads and rain water drainage.
Architectural and structural solutions for 1 store and 2 warehouses (steel structure) with a total surface of cca. 1700m2.
Internal and external utility networks (Electrical, water supply, sewerage, gas, heating and ventilation, signalization, communication).

Design of production hall and wheat mill with storage silos in Hincesti rayon, Carpineni village, Moldova
Architectural and structural solutions of the wheat mill complex.
Solutions for incorporation of the technological equipment
Solutions for storage silos built of precast concrete elements.

Design of the building with commercial purpose and ware-house for construction materials, Moldova
Architectural and structural solutions.
Solutions for the support wall with a height of 6m.
Internal and external utility networks (Electrical, water supply, sewerage, gas, heating and ventilation, signalization, communication).

Technical Assistance for Municipal Infrastructure Projects in Macedonia
The Works Contracts based on PRAG Contract Conditions.
14 Contracts for rehabilitation of schools, sports’ halls, theatres for a total amount of 6,5 million euro.
11 Projects financed by European Union and 3 projects financed by the Ministry of Local Self Government of Republic of Macedonia.

Struga and Ohrid Water Supply Project in Macedonia
Improvement of the existing Water Supply System through civil and electro-mechanical works; construction of Water intakes and Reservoirs, including automation.
Rehabilitation of 11 existing pumping stations.
Rehabilitation of 6 new and rehabilitation of 2 Reinforced Concrete.
Laying of approx. 50k m. of water network.

MAKE YOUR PROJECTS A REALITY!